Knowing how to specify cladding well comes down to defining the whole system, not just the visible finish. A good specification identifies the product, the substrate it goes on, how it is fixed, how it moves, how it performs in fire, what evidence supports it and how it will be looked after. This checklist sets out what architects and contractors should confirm at each stage, so that what is drawn, priced and installed are the same thing.
Start by defining the brief
Before naming a product, write down what the cladding has to do. That means the building type and height, its use, its location and exposure, the design intent for appearance, the substrate or frame, the target thermal performance of the wall and any planning conditions on materials.
This sounds obvious, but many specification problems start with a product chosen for its look and then forced to fit requirements discovered later. Height and use, in particular, can rule products in or out on fire grounds, so establish them first.
Substrate and fixing system
Substrate
Identify exactly what the cladding is fixed to: masonry, concrete, sheathing board, timber frame, steel frame or an existing wall. State the required flatness, condition and preparation, and on refurbishment projects require a survey of the existing wall. A bonded thin finish such as flexible tiles depends on a sound, prepared substrate and the adhesive system approved by the manufacturer.
Fixing system
Specify the full fixing or support system as the manufacturer designs it: brackets, rails, clips, adhesives, primers, fixings and trims. Rainscreen products such as terracotta panels rely on a support system designed for the panel, and substituting parts of it can change how it performs. Ask for a structural calculation for the fixings, covering wind load and dead load for the building's location, height and exposure.
If you are choosing between clay rainscreen formats, our comparison of terracotta rainscreen panels and baguettes covers the design differences.
Movement joints and tolerances
All buildings move, through thermal expansion, moisture, settlement and frame deflection. Show movement joints on the drawings, aligned with structural movement joints and the manufacturer's recommended spacing, and specify their width and filler or sealant. State the installation tolerances and how the system accommodates variation in the substrate.
Fire classification and compliance
Fire performance is the part of a cladding specification that must never rest on assumption. In England, Regulation 7(2) of the Building Regulations 2010 requires materials in the external walls and specified attachments, such as balconies and solar shading, of relevant buildings with a storey over 18 metres to achieve European classification A1 or A2-s1,d0, with listed exemptions. Relevant buildings include flats, hospitals, care homes, student accommodation and dormitories, and the 2022 amendment added hotels, hostels and boarding houses.
The same amendment banned metal composite material panels with an unmodified polyethylene core on buildings of any height. In UK fire-safety documents, MCM means metal composite material. Billi's MCM means Modified Clay Material, a different product, so make sure specifications and schedules are unambiguous.
Approved Document B also gives guidance for residential buildings with a storey between 11 and 18 metres. Confirm the route with a fire engineer and your building control body, and check you are using the current edition. For every product, obtain the classification report or data sheet and confirm it covers the intended use and build-up. Our guide to cladding fire safety in the UK explains the context.
Warranties, data and documents to ask for
Request these documents from the manufacturer or supplier and keep them in the project record:
- Product data sheet for the exact product and finish.
- Fire classification report covering the intended use.
- Installation guidance for the full system, including substrate preparation.
- Fixing design or calculations for the project's wind and dead loads.
- Movement joint guidance and recommended spacing.
- Durability and weathering information, including colour stability where relevant.
- Care and maintenance guidance, including approved cleaning methods.
- Warranty terms: what is covered, for how long, under what installation and maintenance conditions, and whether the warranty covers the product only or the installed system.
If any document is missing or does not match the product being supplied, resolve it before the order is placed.
Cladding samples, mock-ups and approvals
Cladding samples are essential for colour, texture and natural variation. Ask for more than one sample of each finish to see the range of variation, and review them outdoors on site in daylight against adjoining materials.
On larger or more complex projects, specify a mock-up or benchmark panel. It should include a typical corner, a window interface, a movement joint and the agreed joint width and colour. Once approved by the client and design team, it becomes the standard the rest of the installation is judged against. Record the approval in writing with photographs.
Maintenance and handover
A specification should anticipate the building's life after completion. Include the manufacturer's care and maintenance guidance in the operation and maintenance manual, along with product references, batch numbers where relevant, and the warranty documents. Consider access for inspection and cleaning at design stage, and specify a quantity of spare units for future repairs.
The cladding specification checklist
| Stage | Confirm | Evidence |
|---|---|---|
| Brief | Building height, use, location, exposure and design intent | Design brief, planning conditions |
| Product | Exact product, finish and format | Product data sheet |
| Substrate | Type, condition, flatness and preparation | Survey, substrate specification |
| Fixing system | Complete system and components from one source | Installation guidance, fixing calculations |
| Movement | Joint positions, widths and sealants | Drawings, manufacturer guidance |
| Cavity and membranes | Cavity depth, ventilation, membranes, cavity barriers | Wall build-up drawings |
| Fire | Classification for the intended use and build-up | Classification report, fire engineer and building control input |
| Interfaces | Windows, doors, roofs, ground, services | Detail drawings |
| Warranties | Scope, duration and conditions | Written warranty terms |
| Samples | Colour, texture and variation | Approved samples |
| Mock-up | Joints, corners, interfaces | Approved benchmark panel, photographs |
| Handover | Care guidance, spares, records | O&M manual |
Specify with Billi
Billi supports architects and contractors across the UK with samples, product guidance and practical advice on its Modified Clay Material and façade ranges. Request samples for your shortlist, or talk to the team to request the product documents for your specification.
Frequently asked questions
What should a cladding specification include?
A cladding specification should identify the exact product and finish, the substrate and its preparation, the complete fixing or support system, movement joint positions, cavity and membrane details, fire classification evidence, tolerances, interfaces with windows and roofs, sample and mock-up requirements, warranties, and the maintenance and cleaning guidance to be handed over.
Why are cladding samples and mock-ups important?
Samples show true colour, texture and variation in a way that screens and brochures cannot. A mock-up goes further, showing joints, fixings, corners and interfaces at full scale on site. Approving a sample panel or mock-up gives the client, architect and contractor a shared benchmark to judge the installed work against.
Who is responsible for checking cladding fire classification?
Responsibility sits with the design team and principal contractor under the building's procurement arrangements, working with a fire engineer where needed and the building control body. The specifier should obtain the product's classification report, check it covers the intended use and build-up, and keep it in the project record. Never rely on a summary or brochure claim.